4: Operating Procedures
4-2 UPS724-01-00 PowerWave 1000 (1-3kVA) User Manual - Dated 26 June 2013
4.1.2 Start-up on battery mode (cold start)
In the absence of the utility power supply, the UPS can be started from its internal batteries – sometimes referred to as a
“cold start”. This is only possible if the batteries are well charged – to a minimum of 33.5V in the case of a 1 kVA unit and
67V for the 2 kVA and 3 kVA units. This is achieved if the batteries have been charged for a minimum of 4 hours.
Note: Read through this procedure before you attempt to carry it out. In a part of this procedure you have to press the
ON button twice within a one second period. If you take longer than one second between presses the UPS will not start
and you will have to turn it
OFF,
by pressing the
OFF
button, before you can make another attempt to start it.
1. Hold the ON button for approximately 3 seconds until a double beep is
heard then momentarily (within one second) release the button and
press it again for approximately 3 seconds until a further beep is heard.
During the first button press
a) The UPS fans will start.
b) The UPS control system will boot-up and initially turn on all the leds
and LCD symbols for a few seconds.
c) When control system boot-up has completed, all the leds will turn
off, the LCD mimic will display the UPS connected to the battery and
the UPS status will be shown as
off.
Following the second button press
a) The LCD display will initially keep the UPS
off screen displayed for
a few seconds.
a) The UPS will then run an initialisation self-test routine, with
Inlt
status shown on the LCD.
b) The audible alarm will sound intermittently but may be silenced by
pressing the alarm silence (ON) button.
c) If the UPS does not complete its initialisation self test successfully
the LCD will show a FalL status message.
d) If the UPS passes its initialisation self test the LCD mimic display
will show that the UPS is operating on battery and the input voltage
will be indicated as
0 V on the LCD meter.
e) The two programmable outlet LEDs will illuminate (if programmed to
be turned on) to show that these two output are now live, but the
utility supply and bypass supply leds will remain extinguished
2. Check all metered parameters to ascertain that the battery voltage and
UPS output indications are correct (see page 4-3)
W
CAUTION: When turning on the UPS for the first time, or following a long shut down period, leave the unit
running for at least eight hours to fully charge the batteries before connecting any critical load.
1
2
LINE UPS LOAD
1
2
LINE UPS LOAD
1
2
LINE UPS LOAD
V
1
2
LINE UPS LOAD
1
2
LINE UPS LOAD
V
A
%
Hz
C
LOW
?
Page view 35
1 2 ... 31 32 33 34 35 36 37 38 39 40 41 ... 51 52

Comments to this Manuals

No comments